Mitch and Darrell finish up the pipe railings, seems like there are miles of them. The rainy weather is not helping finish up this job!
We have a sign made up with our new "dba" name. Love the font on this and it will read well from the street.
Since code requires we have a smooth walk from sidewalk to ADA ramp, we decide to have other concrete walks as well to front entrance and from driveway
to Beekman porch entrance. More dirt piles....
No comments:
Post a Comment